Thursday 21 June 2012

Pre-Planned Preventive Maintenance-Boom Barriers

Check Points for the  Pre-Planned Preventive Maintenance-Boom Barriers

1)      Checking of all piston system for oil leakage and the maintenance of the all its parts.
2)      Checking of the boom for the proper functioning and to ensure the proper alignment of the same.
3)      Checking of all the safety sensors for normalcy.
4)      Checking of all the reader systems for proper functioning.
5)      Checking of all the mechanical parts including nut & bolts and to ensure their proper functioning.
6)      Checking and service of all the control wiring associated with the boom barrier.
7)      Diagnosis of the any electrical and mechanical faults and their rectification.

7 comments:

  1. Thank you for sharing nice information.

    Boom Barriers

    ReplyDelete
  2. Find Robust Quality Boom barrier Manufacturers and Supplier in India.For More Details Call Us +91 9871938234.

    ReplyDelete
  3. Hom Automation Pvt. Ltd. has been Full Height Turnstiles Manufacturers and Suppliers in India since over a decade with an expertise in providing need based solutions to the industry across the segments.

    ReplyDelete
  4. Awesome,
    Thank you so much for sharing such an awesome blog...
    boom barriers

    ReplyDelete

  5. Thank you for your post. This is excellent information. It is amazing and wonderful to visit your site.
    Boom Barriers

    ReplyDelete
  6. Thanks for this. I really like what you've posted here and wish you the best of luck with this blog and thanks for sharing. Passbox interlocking system
    Door interlocking system suppliers
    Electro Magnetic Locks in Hyderabad

    ReplyDelete