SOP-Chillers

Standard  Operating Procedure- Chiller

Switching "ON"  Chiller
Check the power supply in Chiller panel on Panel
Ensure all necessary valves are in open condition
Switch ON the required no. of Primary/ Condersor Pump(s) and cooling tower fan (s)
Ensure required no. of Secondary Pumps are started
Switch ON the Chiller in auto mode by selecting Auto on display unit
Check the inlet and outlet water temperature and all electrical parameters
Check and note all parameters
Record the readings as per the log sheet and schedule
Switching "OFF" Chiller
Give Stop command at display unit
Check the equipment for stop condition
Switch OFF CT fan, Condenser, primary and secondary pumps