Sunday 24 June 2012

SOP-Secondary Pumps

Standard  Operating Procedure- Secondary Pumps

Switching "ON" of Secondary Pump
Check the power supply in Chiller panel
Check the power supply in DDC and VFD panels
Switch ON the required no. of Secondary Pump(s) in VFD panel
Check the pumps for any abnormalities
Check the inlet and outlet water temperature and all electrical parameters
Record the readings as per the log sheet and schedule
Switching "OFF" of Air Handling Unit
Switch off the pump(s) in VFD panel
Check the equipment for stop condition

No comments:

Post a Comment